Aim of the project
- To establish a new and effective sewage rationalization works at Kota Kinabalu, Sabah which will reduces the polution loading into the receiving water courses.
- To reduce the bad odour and buffer issue faced by residence.
- Establishing green areas through the rationalization of the old treatment plants.
- To establish a new sewerage system which is cost effective in terms of operational and maintenance wise.
Scope of works
- Duration of project: (2021 - Present)
- Sizes of pipe jacking involved: ∅300mm, ∅450mm, ∅600mm, ∅750mm, ∅900mm, ∅1050mm, ∅1200mm
- Total nos of shaft: 101nos
- Type of shaft involved: Sheet Pilling Method & Sinking Method
- Total nos of Manhole : 101nos