South Bangkok Power Plant Transmission Pipeline Project – Phase 1
April 28, 2024Water Dam System Steel Pipe Installation
December 1, 2022
Aim of the project
- To establish a new and effective sewage rationalization works at Lahad Datu, Sabah which will reduces the pollution loading into the receiving water courses.
- To connect pipelines for waste water by using Manshield Excavation Method.
Scope of works
- Duration of project: (2021 - Present)
- Sizes of pipe jacking involved: ∅1500mm
- Type of jacking method: Manshield Excavation Method