Aim of the project
- To establish a new and effective sewage rationalization works at Kuching, Sarawak which will reduces the pollution loading into the receiving water courses.
- Establishing green areas through the rationalization of the old treatment plants.
- To establish a new sewerage system which is cost effective in terms of operational and maintenance wise.
Scope of works
- Duration of project: (2019 - 2022)
- Sizes of pipe jacking involved : ∅1500mm
- Total Distance Length (km): 1.447km
- Total Nos of Shaft: 10
- Type of Shaft: Sheet Pilling Method & Sinking Method