Aim of the project
- To establish a new and effective sewage rationalization works at Miri, Sarawak which will reduces the pollution loading into the receiving water courses.
- Establishing green areas through the rationalization of the old treatment plants.
- To establish a new sewerage system which is cost effective in terms of operational and maintenance wise.
Scope of works
- Duration of project: (2018 - 2021)
- Sizes of pipe jacking involved: ∅750, ∅1500mm, ∅1800mm
- Total nos of shaft: 31nos
- Type of shaft involved: Sheet Pilling Method & Sinking Method
- Total nos of Manhole : 31nos